Posted in LAPD HQ Construction by: skidrowdude
Lots of progress- these pics were not all taken the same day, but during the week of 1/27/08 - 2/2/08. Sorry for the fuzzy look but they were taken through the window of my loft which is very dirty after the rains.
Name (required)
Mail (will not be published) (required)
Website
© 2012 White Boy/White Dog Move To Skid Row | Entries (RSS) and Comments (RSS)
Powered by Wordpress, design by Web4 Sudoku, based on Pinkline by GPS Gazette